Tongtong Zhang, Xiaohui She, Yulong Ding. A power plant for integrated waste energy recovery from liquid air energy storage and liquefied natural gas[J]. 中国化学工程学报(英文版), 2021,34(6):242-257.
Tongtong Zhang, Xiaohui She, Yulong Ding. A power plant for integrated waste energy recovery from liquid air energy storage and liquefied natural gas[J]. Chinese Journal of Chemical Engineering, 2021, 34(6): 242-257.
Tongtong Zhang, Xiaohui She, Yulong Ding. A power plant for integrated waste energy recovery from liquid air energy storage and liquefied natural gas[J]. 中国化学工程学报(英文版), 2021,34(6):242-257.DOI: 10.1016/j.cjche.2021.02.008.
Tongtong Zhang, Xiaohui She, Yulong Ding. A power plant for integrated waste energy recovery from liquid air energy storage and liquefied natural gas[J]. Chinese Journal of Chemical Engineering, 2021, 34(6): 242-257.DOI: 10.1016/j.cjche.2021.02.008.
A power plant for integrated waste energy recovery from liquid air energy storage and liquefied natural gas
Liquefied natural gas (LNG) is regarded as one of the cleanest fossil fuel and has experienced significant developments in recent years. The liquefaction process of natural gas is energy-intensive
while the regasification of LNG gives out a huge amount of waste energy since plenty of high grade cold energy (-160℃) from LNG is released to sea water directly in most cases
and also sometimes LNG is burned for regasification. On the other hand
liquid air energy storage (LAES) is an emerging energy storage technology for applications such as peak load shifting of power grids
which generates 30%-40% of compression heat (~200℃). Such heat could lead to energy waste if not recovered and used. The recovery of the compression heat is technically feasible but requires additional capital investment
which may not always be economically attractive. Therefore
we propose a power plant for recovering the waste cryogenic energy from LNG regasification and compression heat from the LAES. The challenge for such a power plant is the wide working temperature range between the low-temperature exergy source (-160℃) and heat source (~200℃). Nitrogen and argon are proposed as the working fluids to address the challenge. Thermodynamic analyses are carried out and the results show that the power plant could achieve a thermal efficiency of 27% and 19% and an exergy efficiency of 40% and 28% for nitrogen and argon
respectively. Here
with the nitrogen as working fluid undergoes a complete Brayton Cycle
while the argon based power plant goes through a combined Brayton and Rankine Cycle. Besides
the economic analysis shows that the payback period of this proposed system is only 2.2 years
utilizing the excess heat from a 5 MW/40MWh LAES system. The findings suggest that the waste energy based power plant could be co-located with the LNG terminal and LAES plant
providing additional power output and reducing energy waste.
关键词
Keywords
references
The trial reading is over, you can activate your VIP account to continue reading.
Univariate imputation method for recovering missing data in wastewater treatment process
A more precise method to evaluate kinetic leakage of anion exchange resin used in condensate polishing of power plant
Integration of energy recovery network including recycling residual pressure energy with pinch technology
Integration of coal pyrolysis process with iron ore reduction: Reduction behaviors of iron ore with benzene-containing coal pyrolysis gas as a reducing agent
An agent-based service-oriented integration architecture for chemical process automation
相关作者
Junfei Qiao
Xiaolong Wu
Huayun Han
Meiting Sun
Honggui Han
Chunsong Ye
Xuxiang Jia
Tianping Wang
相关机构
af015. Engineering Research Center of Digital Community, Ministry of Education
af010. Beijing Key Laboratory of Computational Intelligence and Intelligent System
af005. Faculty of Information Technology, Beijing University of Technology
Department of Water Quality Engineering, School of Power & Mechanical Engineering, Wuhan University
Shaanxi Coal and Chemical Technology Institute Co., Ltd