Li Zhu, Hongye Su, Shan Lu, 等. Coordinating and Evaluating of Multiple Key Performance Indicators for Manufacturing Equipment: Case Study of Distillation Column[J]. 中国化学工程学报(英文版), 2014,22(7):805-811.
Li Zhu, Hongye Su, Shan Lu, YueWang, Quanling Zhang. Coordinating and Evaluating of Multiple Key Performance Indicators for Manufacturing Equipment: Case Study of Distillation Column[J]. , 2014, 22(7): 805-811.
Li Zhu, Hongye Su, Shan Lu, 等. Coordinating and Evaluating of Multiple Key Performance Indicators for Manufacturing Equipment: Case Study of Distillation Column[J]. 中国化学工程学报(英文版), 2014,22(7):805-811.DOI: 10.1016/j.cjche.2014.05.007.
Li Zhu, Hongye Su, Shan Lu, YueWang, Quanling Zhang. Coordinating and Evaluating of Multiple Key Performance Indicators for Manufacturing Equipment: Case Study of Distillation Column[J]. , 2014, 22(7): 805-811.DOI: 10.1016/j.cjche.2014.05.007.
Coordinating and Evaluating of Multiple Key Performance Indicators for Manufacturing Equipment: Case Study of Distillation Column
摘要
Abstract
Manufacturing equipment takes the task of operation and directly effects on the manufacturing process. One single Key Performance Indicator (KPI) is mainly employed to evaluate equipment inmost studies
neither integrating the KPIs into a completed evaluation system nor considering the impact and conflict among KPIs. In this paper
a KPI evaluation architecture is presented to define and analyze KPIs
and then a common structure for KPI to obtain the KPI set of manufacturing equipment is introduced. An available multi-KPI coordination model is proposed to discern and balance the relationship amongmulti-KPI. Finally
a case study is introduced to illustrate the applicability of the coordination model by using multi-objective optimization strategy and an efficient solution is obtained.
关键词
Keywords
references
The trial reading is over, you can activate your VIP account to continue reading.