Your Location:
Home >
Browse articles >
Inspection Models Considering the Overlapping of Inspection Span and Failure Downtime
Updated:2026-01-06
    • Inspection Models Considering the Overlapping of Inspection Span and Failure Downtime

    • Chinese Journal of Chemical Engineering   Vol. 20, Issue 6, Pages: 1167-1173(2012)
    • DOI:10.1016/S1004-9541(12)60603-X    

      CLC:
    • Published:2012

    Scan QR Code

  • ZHANG Xingfu, CHEN Maoyin, ZHOU Donghua. Inspection Models Considering the Overlapping of Inspection Span and Failure Downtime[J]. Chin.J.Chem.Eng., 2012, 20(6): 1167-1173. DOI: 10.1016/S1004-9541(12)60603-X.

  •  
  •  
icon
The trial reading is over, you can activate your VIP account to continue reading.
Deactivate >
icon
The trial reading is over. You can log in to your account, go to the personal center, purchase VIP membership, and read the full text.
Already a VIP member?
Log in >

0

Views

796

Downloads

0

CSCD

Alert me when the article has been cited
Submit
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Understanding temperature-dependent degradation in proton exchange membrane water electrolyzer: The critical role of porous transport layer
Bubble dispersion intensification via flow guidance and drainage in a bubble column with internals
Non-phosgene synthesis processes of isocyanates: One-step and two-step routes
Synergistically coupling of vertically oriented Ru/Co co-doped MoS2 with interfacial engineering for efficient electrochemical hydrogen evolution
Recovery rubidium chloride and cyclic utilization of hexacyanoferrate(II) ion from hexacyanoferrate-internediate solutions via solvent extraction

Related Author

No data

Related Institution

No data
0